jQuery(document).ready(function() { jQuery("#search-icon").click(function() { jQuery(this).hide(); jQuery(".elementor-search-form__container input").show(); jQuery(".elementor-search-form__container button").show(); }); }); (function(c,l,a,r,i,t,y){ c[a]=c[a]||function(){(c[a].q=c[a].q||[]).push(arguments)}; t=l.createElement(r);t.async=1;t.src="https://www.clarity.ms/tag/"+i; y=l.getElementsByTagName(r)[0];y.parentNode.insertBefore(t,y); })(window, document, "clarity", "script", "cuvejz4376");

Streamlining the Production Process with Phillips Opto

Phillips Education Case Study

What Happens After Phillips Haas Training?

Turning Training Into 10x ROI

According to recent alumni survey results, Phillips Haas Training is generating an average of $45K in savings for manufacturers nationwide. Companies are seeing measurable improvements in speed, uptime, confidence, and responsiveness.

Technicians servicing a Haas CNC machine during Phillips training $45K Avg. Savings

The Objectives & Challenges

Manufacturers across aerospace, medical, automotive, and production machining environments enrolled technicians, operators, and programmers in Phillips Haas Training after facing recurring operational challenges, including:

  • Delayed machine recovery
  • Long waits for outside service support
  • Reactive maintenance practices
  • Production interruptions caused by machine downtime
  • Limited in-house troubleshooting knowledge
  • Growing pressure on smaller maintenance teams

For lean operations, even a few hours of unplanned downtime can impact throughput, labor efficiency, delivery timelines, and customer commitments. Industry research shows manufacturers average hundreds of hours of unplanned downtime annually, with equipment failure and technician knowledge gaps remaining major contributors.

What Happened Next

Many companies recognized that relying on outside support was becoming increasingly difficult, especially when the cost of a major breakdown or delayed repair could quickly outweigh the investment in Phillips Haas Training itself.

Michael Goode, GE

Oversees 78 Haas machines and calculated that the training paid for itself 10x in less than a year. GE has since sent 30+ technicians through the program to strengthen internal capabilities and improve uptime.

Joshua Boulee, Kohler

Said Phillips training gave him the confidence to troubleshoot machines across multiple departments, including machines he had never worked on before.

Kaleb Todd, Brasseler USA

Used the skills gained through Phillips training to step into a larger R&D leadership role with stronger troubleshooting and programming capabilities.

Billy Hatchett, Sefcor

Rebuilt his programming approach after training, improving machine understanding and overall operational value.

Alumni Survey Results:
$20K–$70K+
cost savings post completion
25–50%
faster troubleshooting speed
20+ Hours
in downtime saved per month
6–10+
service calls avoided

“The training paid for itself within the first 3 months. We’re seeing significantly faster diagnosis and repair times.”

— Greg Smith, Starn Tool & Mfg.

“Shortly after attending training, our company rebuilt around 40 machines internally. Being able to complete those repairs in-house dramatically reduced turnaround time, lowered dependency on service calls, and has already contributed to more than $70K in savings.”

— John O’Neil, Sturm, Ruger, & Co.
We are a community of manufacturing experts dedicated to delivering the best solutions
Ask Jason